Environmental International Corporation Site Map About Us
  Contact Us Downloads Careers Global Offices Press Release Global Offices EIC Home  
EIC Products
EIC Solutions
Project Listings
Place an on-line Ordering
 

EIC IMPLEMENTS REMEDIAL SYSTEM IN OOLITIC LIMESTONE AQUIFER

 

NOV 2007, Nassau, Bahamas:  Bahamas Electricity Corporation (BEC) retained EIC to implement a remedial program at the Clifton Pier Power Station in Nassau, Bahamas.  BEC had discovered presence of non-aqeuous phase liquids (NAPL) in the subsurface at various locations beneath the power station.  The subsurface is composed of a unique oolitic limestone formation that is tidally influenced from the nearby ocean.    Overcoming the effects of water-table fluctuations, EIC successfully installed its unique non-aqueous phase liquid extraction technique (NET) based remedial systems.  Field measurements indicated that the NET systems are recovering NAPL with oil-water ratios greater than 90%.  The source(s) of the NAPL release(s) are currently under review.

 
   

© 2003 Environmental International Corporation. All Rights Reserved